Front end engineering design on the seven-berth complex
Front end engineering design on adaptation for use in modern conditions for the berth complex. Location: 3 Makarova embankment, Saint-Petersburg

Dorsan asphalt concrete compound is an innovation in protection and “rejuvenation” of road surfaces. It is a simple but effective solution if you want to extend the life of the road and reduce repair frequency.
can be used on all roads and in all climatic zones
increases the resistance of organic matter to the road surface
can be used on stone mastic asphalt mix
the impregnating compound extends the period between repairs by 1 to 3 years
easy application
the road is open to the traffic after just 3 hours
impregnation depth of asphalt concrete is 30 to 35 mm.
Dorsan consumption rate:
normal asphalt concrete with increased water saturation: 0.6-0.7 kg/m2 - 57-67 rub/m2
at the initial stage of spading: 0.7-0.8 kg/m2 - 67-76 rub/m2
at the stage of severe spading: 0.7-0.8 kg/m2 - 67-76 rub/m2 + coarse sand
at the stage of peeling: 0.8-1.2 kg/m2 - 76-114 rub/m2 + screening crushing 2-5 fractions (dust-free, washed)
The cost of the work is 10-15% of the cost of the material.
Patching costs 800-1200 rub/m2, so preventive impregnation treatment is 8-10 times more cost-efficient.
Front end engineering design on adaptation for use in modern conditions for the berth complex. Location: 3 Makarova embankment, Saint-Petersburg
Preparation of design estimates and detailed design documents for the hydraulic structures, located in the permafrost conditions.
Project works on the overhaul of the right walls of sections No.5, No.6 of the chamber and seepage elimination in the culverts of the Upper Svir lock; Project works for the project named "Overhaul of the berth of the upper access canal of lock No.1".
Preparation of the Letter (Declaration) of Intent to Invest in the construction of the Indiga seaport and support during the approval procedure of the Letter in the Federal Agency for Marine and River Transport and/or its subordinate coordinating institutions
Project works, including the investment policy statement on the facility "Construction of a port and logistics complex and supporting infrastructure of Rostov Port JSC in Zarechnaya industrial zone"
We are ready to solve custom tasks set by the client